Feb
20
Written by:
Fritz Weinrebe
20 February 2010
The rods are connected to the motors and all three axises are now moving under the control of Mach3. The X-axis needs a bit of alignment. The black permanent marker pen I am using to test the alignment of the CNC is straining when moving the X axis towards the right. After checking with a ruler, I noticed the Left side is about 1mm lower than the right side. I will be fixing this next. Once I am 100% happy with the alignment, I will move on mount the Spindle motor and cut some real stuff.
Tags: